Summary

 Strong organizational and time management.
 Work under tremendous work pressure & meet with the dead-lines with ease.
 Efficiency and high productivity with accurate results.
 Extensive experience in multi-project planning and management for delivery of large and Complex Systems.
 Excellent in team building, leading and monitoring teams.
 Ability to learn quickly and adapt to changing environments.
 People’s management.
 Review and evaluate alternative Communication systems.
 Prepare evaluation reports.

Experiences

QA/QC MANAGER June 2015 - Present ( 6 Years - 4 Months )

Arabtec Construction LLC. | Construction ( Industry )

UAE

Quality Assurance( Role )

QA/QC Manager
Al Ain Hospital Project, (MUSANADAH / SEHA)
Key Responsibilities

 Manage all QA/QC activities for the project.
 Effective implementation of Project Quality Plan, ITPs, Method Statements etc.
 Develops and Implements KPI`s & RIA`s.
 Co-ordinate with the Main Contractors, Consultants & Client representatives with respect to all Quality management Issues.
 Co-ordinate with QHSE Manager on matters related to Quality like scheduling /conducting Internal Audits.
 Manage QA/QC Sub-ordinates at site.
 Manage all Procurement Material Inspection and Work Inspection in the project.
 Liaise with site staff on matters concerning Quality.
 Attend all external and internal as well as Site progress meetings.
 Report any violation to Quality to Project Manager and issue NCR, if necessary.
 Oversee the necessary follow-up action for Corrective & Preventive Actions, Site Instructions, NCRs, and Quality Observations.
 Impart and enhance a culture of good QA/QC practice within subordinates, by instigating and leading awareness programs, and recommending training courses, wherever justified and deemed necessary.
 Implementation of Quality management system on site.
 Compliance with local regulations and industry standards.
 Maintenance & upkeep of QA/QC personnel discipline, to ensure that all inspection target dates and schedules are being met.
 Ensuring that all necessary QA/QC related verification and control documentation is being generated by the QA/QC Coordinators, Engineers and Inspectors, and is recorded and registered by the QA/QC Document Controller(s).
 Assisting with the compilation and review of Method Statements, generated by the project or management teams.
 Maintain copies of Standards, Codes of Practice, and Local Authority Regulations, etc, as per the updates issued by the Corporate QHSE Department.
 Monitor the status of the register(s) of testing & measuring equipment and instruments, maintained by the Storekeepers, including the calibration status in order to ensure accurate and reliable readings.
 Agreeing and establishing an exit strategy, with all department heads, at an early stage of a project, to ensure that all contract deliverables are achieved, within the target dates set for project handover and close-out.

QA/QC MANAGER March 2014 - June 2015 ( 1 Years - 3 Months )

MERCURY MENA QATAR | Construction ( Industry )

QATAR

Quality Assurance( Role )

QA/QC Manager
- Workers Hospital (WHICH) Project.
- Qatar National Library (QNL) Project.

Key Responsibilities

• Develops and implements a project Quality Plan (PQP) in line with ISO 9001:2008.
• Promotion and support of the Mercury and objectives and leading by example in all aspects relating to quality
• Ensures that the quality system is developed and implemented in a manner to ensure efficiency of all activities.
• Decides about regular auditing of the Quality Policy implementation.
• Monitors and reports on the implementation of Company’s management system through formal audit activities.
• Represents the company regarding its clients, suppliers/sub-contractors, foreign advisors and Certification Authority, regarding the Quality Policy and the follow-up of the requirements of ISO 9001:2008
• Ascertains for the dissemination and the implementation of the Quality Policy and targets of company in all sectors.
• Ascertains that the quality system is regularly followed and improved.
• Perform audits, where required, of suppliers and subcontractors.
• Regularly reports to the Project Manager regarding the development and effectiveness of the Quality Assurance System in Mercury, suggesting subjects for the quality system review.
• Cooperates with the Department Managers and the Project Manager for the identification and adoption of improvements of the current Quality Management system and procedures.
• Monitors and reports on the implementation of Project Quality Management System through formal audit activities
• Will ensure that upon application for the taking over certificate that the client is supplied with a complete set of original and two copies of all Licenses, certificates and approvals as required by the contract.
• Oversees the Final Turnover Documentation preparation
• Compiles and keeps a copy of all technical literature referenced in all drawings and specifications to be stored on the project site maintained in good order and to be made available to the employees. The QA/QC Department retains overall responsible for collection, compilation and submission of all close out documentation.
• Promotion and support of the Mercury PQP and its objective, leading by example in all aspects relating to quality
• Leads the QC engineers, QC Inspectors QA Admin. at site and provide assistance in any quality system matters applied to the project.
• Provides guidance and assistance to all site staff with respect to any aspect of the management system applied to the project.
• Performs spot checks on the works and on the quality records for compliance with the procedures and Inspection and Test Plans
• Co-ordinates with the independent inspection bodies.
• Maintains the site facility for filing quality records
• Assists project staff in the preparation of quality documentation, such as Method Statements, Inspection & Test Plans and work procedures, Quality Control Plans for special processes.
• Develops and Implements KPI`s, RIA`s & ITP`s.
• Ensures by random checks that the documents used in the work section are controlled according to the Document & Data Control Procedure.
• Responsible for the analysis of non-conformances and involved in the proposal, implementation and follow-up of corrective and preventive actions.
• Ensures that subcontractors and suppliers implement the applicable controls specified in the project (PQP) and the identified management system documentation.
• Ensures implementation of the Quality Control system by the subcontractors.
• Promotes quality throughout the project ensuring all staff and sub-contractors are adequately trained and aware of the project quality plan and requirements through induction training for all QC staff, inspectors and engineers.
• Ensure all project and specification testing and inspection requirements are incorporated into the ITP’s
• Creates document formats for Document Control Head.
• Maintains Snag List Records.
• Investigates and reports all non-conformances and provides corrective and preventive measures.
• Creates document process and procedures.
• To develop O&M Index and issue to DCH.
• Guides and trains QC Engineer for witnessing the Test and Commissioning.
• Conducts training to all departments for their roles and responsibilities.

QA/QC MANAGER January 2013 - March 2014 ( 1 Years - 1 Months )

THERMO LLC. UAE/SAUDI | Construction ( Industry )

UAE/SAUDI

Quality Assurance( Role )

QA/QC Manager KASC PROJECT
KING ABDULLAH SPORT CITY, JEDDAH (ARAMCO)
Key Responsibilities

 Manage all QA/QC activities for the project.
 Effective implementation of Project Quality Plan, ITPs, Method Statements etc.
 Co-ordinate with the Main Contractors, Consultants & Client representatives with respect to all Quality management Issues.
 Co-ordinate with QHSE Manager on matters related to Quality like scheduling /conducting Internal Audits.
 Manage QA/QC Sub-ordinates at site.
 Manage all Procurement Material Inspection and Work Inspection in the project.
 Liaise with site staff on matters concerning Quality.
 Attend all external and internal as well as Site progress meetings.
 Report any violation to Quality to Project Manager and issue NCR, if necessary.
 Oversee the necessary follow-up action for Corrective & Preventive Actions, Site Instructions, NCRs, and Quality Observations.
 Impart and enhance a culture of good QA/QC practice within subordinates, by instigating and leading awareness programs, and recommending training courses, wherever justified and deemed necessary.
 Implementation of Quality management system on site.
 Compliance with local regulations and industry standards.
 Maintenance & upkeep of QA/QC personnel discipline, to ensure that all inspection target dates and schedules are being met.
 Ensuring that all necessary QA/QC related verification and control documentation is being generated by the QA/QC Coordinators, Engineers and Inspectors, and is recorded and registered by the QA/QC Document Controller(s).
 Assisting with the compilation and review of Method Statements, generated by the project or management teams.
 Maintain copies of Standards, Codes of Practice, and Local Authority Regulations, etc, as per the updates issued by the Corporate QHSE Department.
 Monitor the status of the register(s) of testing & measuring equipment and instruments, maintained by the Storekeepers, including the calibration status in order to ensure accurate and reliable readings.
 Agreeing and establishing an exit strategy, with all department heads, at an early stage of a project, to ensure that all contract deliverables are achieved, within the target dates set for project handover and close-out.

Education

Military Technical College (M.T.C.) Cairo, Egypt 1986

(Bachelor of Science) , Electrical Engineering , B

Target Job

QA/QC MANAGER

Ad Dawhah, QATAR

Salary 50000 QAR - Qatari Riyal

Projects

WHOLE PROJECTS IN GGC. June 2015

MAJOR PROJECTS

Project: AL AIN HOSPITAL PROJECT (UAE)
Value (AED) 850 M for MEP Works

Project: WORKERS HOSPITAL & INTEGRATED HEALTH CENTRE (QATAR)
Value (Q.R) 650 M for MEP Works

Project: QATAR NATIONAL LIBRARY (QATAR)
Value (Q.R) 450 M for MEP Works

Project: KING ABDULLAH SPORT CITY (ARAMCO KSA)
Value (S.R) 980M for MEP Works

Project: SIDRA MEDICAL & RESEARCH CENTRE (QATAR)
Value (Q.R) 1.1B for MEP Works

Project: PRESIDENTIAL PALACE ABU DHABAI (UAE)
Value (AED) 500M for MEP Works 1St. Phase

Project: AL RAHAA BEACH RESORT ABU DHABAI (UAE)
Value (AED) 400M for MEP Works

Project: CAPITAL PLAZA DEVELOPMENT ABU DHABAI (UAE)
Value (AED) 580M for MEP Works
5 Towers (45-50) floors + Mall + Hotel

Project: DUBAI MALL DUBAI (UAE)
Value (AED) 450M for MEP Works

Project: ETISALAT TELECOM & ADMIN. BUILDING DUBAI (UAE)
Value (AED) 350M for MEP Works

Courses

QMS LEAD AUDITOR

From IRCA/UAE in March 2004

QMS INTERNAL AUDITOR

From RWTUV/ UAE in September 2003

Language

  • Arabic Native

  • English Expert

Personal Info

Gender: Male

Birth Date: 1962-08-15

Nationality: Egypt

Country: Egypt

City: Cairo

Recommendation

There are no recommendations