Planning Engineer

No Name
UAE - Dubai

Posted

  • Career Level

    Excutive/Director

Job description

    Develop baseline schedules using Primavera Develop Cost performance baseline Preparation of Work Breakdown Structure 40 WBS 41 Conduct estimation of manpower, equipment, tools, materials and consumables in consultation with construction managers Coordinate with client, site management, sub contractors, third parties and site team for project activities, progress expediting, risks and resolve issues Analyzing regular progress monitoring by using Primavera Evaluate variance analysis for actual performance against the planned performance Monitoring the project health by critically analyzing project reports on weekly and monthly basis and raise flags in case of slippages from schedule and low productivity Preparation of progress reports for client and management Risk identification risk response planning Identify and update requirement of manpower, direct material and equipment based on 3 months plan Coordinate with HSE team to train and educate the site team and ensure use of safety procedures and equipment
Read More Read Less
Recent Jobs

Download Jobzella Mobile App

Jobzella mobile app for Android and iPhone