Stack out of Piles check out of existing levels Topography survey Alignment of grids Setting out of structures All structural work of building Vertical Alignment Erection of Overhead store water tank Setting out of irrigation, chamber Site Measurement for monthly, final valuation Checking of profile, cross section etc. Stack out of Piles check out of existing levels All kinds of buildings works layout. Fixing of control section Controlling the work as per design Excavation, drainage, water sewerage of pipeline trenches Lay out structure work of pipeline Adjusting the 43 levels Cross section levels Road work setting out and leveling